MIP–based heuristic for the unrelated parallel machine scheduling problem with sequence and machine-dependent setup times
DOI:
https://doi.org/10.5902/1983465913305Resumo
In this paper we study the unrelated parallel machine scheduling problem with sequence and machine-dependent setup times. We consider the objective of minimizing the maximum completion time of the latest job, usually referred to as makespan. We propose a new MIP-based heuristic combining atomic moves such as insertion, ejection and closure, in order to generate sequences of such atomic moves minimizing the makespan. This heuristic employs a commercial solver to search the neighborhood in a multi-start algorithm. Our approach performed well in computational experiments targeting two sets of benchmark instances previously used in the literature.
Downloads
Downloads
Publicado
Como Citar
Edição
Seção
Licença
Até 2023 os direitos autorais eram transferidos pelos autores para a ReA/UFSM. A partir de 2024 os autores dos artigos publicados pela ReA/UFSM mantêm os direitos autorais de seus trabalhos.
A revista adota a licença Creative Commons (CC-BY 4.0), que permite que os artigos sejam reutilizados e distribuídos sem restrições, desde que o trabalho original seja devidamente citado.


