MIP–based heuristic for the unrelated parallel machine scheduling problem with sequence and machine-dependent setup times

Autori

  • Felipe Martins Muller Universidade Federal de Santa Maria
  • Olinto Bassi Araujo Universidade Federal de Santa Maria
  • Fernando Stefanello Universidade Federal de Santa Maria
  • Marcelo Zanetti Universidade Federal do Maranhão

DOI:

https://doi.org/10.5902/1983465913305

Abstract

In this paper we study the unrelated parallel machine scheduling problem with sequence and machine-dependent setup times. We consider the objective of minimizing the maximum completion time of the latest job, usually referred to as makespan. We propose a new MIP-based heuristic combining atomic moves such as insertion, ejection and closure, in order to generate sequences of such atomic moves minimizing the makespan. This heuristic employs a commercial solver to search the neighborhood in a multi-start algorithm. Our approach performed well in computational experiments targeting two sets of benchmark instances previously used in the literature.

Downloads

I dati di download non sono ancora disponibili.

Biografie autore

Felipe Martins Muller, Universidade Federal de Santa Maria

CT/DCOM

Olinto Bassi Araujo, Universidade Federal de Santa Maria

CTISM

Fernando Stefanello, Universidade Federal de Santa Maria

PPGI

Marcelo Zanetti, Universidade Federal do Maranhão

CCCT

##submission.downloads##

Pubblicato

2014-09-20

Come citare

Muller, F. M., Araujo, O. B., Stefanello, F., & Zanetti, M. (2014). MIP–based heuristic for the unrelated parallel machine scheduling problem with sequence and machine-dependent setup times. Revista De Administração Da UFSM, 7(3), 506–523. https://doi.org/10.5902/1983465913305

Fascicolo

Sezione

Articles