MIP–based heuristic for the unrelated parallel machine scheduling problem with sequence and machine-dependent setup times
DOI :
https://doi.org/10.5902/1983465913305Résumé
In this paper we study the unrelated parallel machine scheduling problem with sequence and machine-dependent setup times. We consider the objective of minimizing the maximum completion time of the latest job, usually referred to as makespan. We propose a new MIP-based heuristic combining atomic moves such as insertion, ejection and closure, in order to generate sequences of such atomic moves minimizing the makespan. This heuristic employs a commercial solver to search the neighborhood in a multi-start algorithm. Our approach performed well in computational experiments targeting two sets of benchmark instances previously used in the literature.
Téléchargements
Téléchargements
Publié-e
Comment citer
Numéro
Rubrique
Licence
Until 2023, copyright was transferred by the authors to ReA/UFSM. As of 2024, the authors of articles published by the journal retain the copyright to their work. ReA/UFSM operates under a Creative Commons Attribution 4.0 International License (CC BY 4.0), which permits unrestricted reuse and distribution of articles, provided the original work is properly cited.

