MIP–based heuristic for the unrelated parallel machine scheduling problem with sequence and machine-dependent setup times

Auteurs-es

  • Felipe Martins Muller Universidade Federal de Santa Maria
  • Olinto Bassi Araujo Universidade Federal de Santa Maria
  • Fernando Stefanello Universidade Federal de Santa Maria
  • Marcelo Zanetti Universidade Federal do Maranhão

DOI :

https://doi.org/10.5902/1983465913305

Résumé

In this paper we study the unrelated parallel machine scheduling problem with sequence and machine-dependent setup times. We consider the objective of minimizing the maximum completion time of the latest job, usually referred to as makespan. We propose a new MIP-based heuristic combining atomic moves such as insertion, ejection and closure, in order to generate sequences of such atomic moves minimizing the makespan. This heuristic employs a commercial solver to search the neighborhood in a multi-start algorithm. Our approach performed well in computational experiments targeting two sets of benchmark instances previously used in the literature.

Téléchargements

Les données relatives au téléchargement ne sont pas encore disponibles.

Bibliographies de l'auteur-e

Felipe Martins Muller, Universidade Federal de Santa Maria

CT/DCOM

Olinto Bassi Araujo, Universidade Federal de Santa Maria

CTISM

Fernando Stefanello, Universidade Federal de Santa Maria

PPGI

Marcelo Zanetti, Universidade Federal do Maranhão

CCCT

Téléchargements

Publié-e

2014-09-20

Comment citer

Muller, F. M., Araujo, O. B., Stefanello, F., & Zanetti, M. (2014). MIP–based heuristic for the unrelated parallel machine scheduling problem with sequence and machine-dependent setup times. Revista De Administração Da UFSM, 7(3), 506–523. https://doi.org/10.5902/1983465913305

Numéro

Rubrique

Articles