The use of adaptive project management practices and methodologies in the development of a professional doctoral program
DOI:
https://doi.org/10.5902/1983465942849Schlagworte:
Professional Doctorate, Adaptive Project Management, Postgraduate, Project Management, CAPESAbstract
Purpose – Higher education institutions have used more and more project management tools to run development projects to create new professional postgraduate programs. The purpose of this research was to propose an adaptive project management model for creating a professional doctoral course in Business Administration, in order to fulfill the goals established by CAPES.
Design/methodology/approach – For such, the qualitative approach was favored with the adoption of the single case study method. Semi-structured interviews were conducted with academic coordinators who are experts in the field in addition to the gathering of documents, thus using data triangulation to explore the phenomenon. The analysis of primary data and the analysis of documents from the Coordinating Agency for Advanced Training of Graduate Personnel (CAPES) served as inputs for analyzing and interpreting the results.
Findings – As a result, we developed an adaptive project management model with the following characteristics: a) constant planning of activities, occurring in every cycle of interactions; b) iteration using short activities, allowing for more control of the project; c) validations performed continuously to ensure the goals proposed by CAPES are reached; and d) adaptable to change of scope during the execution phase of the project life cycle.
Research limitations/implications – Among the limitations of the study is the lack of other studies related to the use of adaptive project management methodologies for developing postgraduate programs. And for future researches, we point out the need for applying the proposed model, to verify its efficacy and adherence to the development of a professional doctoral course.
Originality/value – This study contributes to the academy by highlighting the need for project management as a tool and technique for the development of stricto sensu professional graduate programs. In this way, HEIs will be able to use a model of adaptive project management practices to achieve the objectives proposed by the CAPES evaluation process. As a result, HEIs are strengthened in the management, control and monitoring of the progress of their programs.
Downloads
Literaturhinweise
Balbachevsky, E. (2005). A pós-graduação no Brasil: novos desafios para uma política bem-sucedida. Os desafios da educação no Brasil. Rio de Janeiro: Nova Fronteira, 1, 285-314.
Barcellos, P. F. P., & Nesello, P. (2014). A contribuição do gerenciamento de projetos no processo de desenvolvimento de produtos. Revista GEINTEC-Gestão, Inovação e Tecnologias, 4(2), 808-822.
Braga, P. P., Romano, C. M., Silva, K. L., & Duarte, E. D. (2019). Utilização de software em análises de dados qualitativos: contribuições para resultados consistentes em investigações nas ciências da saúde. CIAIQ2019, 2, 950-955.
Brioso, X., Humero, A., & Hernández, C. C. (2018). Teaching how to integrate Last Planner System and the Safety and Health Management System= Enseñando a integrar el Last Planner System y el Sistema de Gestión de Seguridad y Salud. Advances in Building Education, 2(1), 12-30.
Carvalho, M. M., & Rabechini Jr, R. (2017). Fundamentos em gestão de projetos: construindo competências para gerenciar projetos. São Paulo: Atlas.
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior [CAPES] (2019a). História e missão. Recuperado de <http://www.capes.gov.br/historia-e-missao>.
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior [CAPES] (2019b). GEOCAPES – Sistema de Informações Georreferenciadas. Recuperado de <https://geocapes.capes.gov.br/geocapes/>.
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior [CAPES] (2019c). Recuperado de <https://capes.gov.br>.
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior [CAPES] (2019d). Avaliação Quadrienal 2017-2. Recuperado de <http://avaliacaoquadrienal.capes.gov.br/resultado-da-avaliacao-quadrienal-2017-2>.
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior [CAPES] (2019e). Portaria 389, de 23 de março de 1017. Dispõe sobre o mestrado e doutorado profissional no âmbito da pós-graduação stricto sensu brasileiro – Ministério de Estado da Educação. Recuperado de <http://www.capes.gov.br/images/stories/download/legislacao/24032017-PORTARIA-No-389-DE-23-DE-MARCO-DE-2017.pdf>.
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior [CAPES] (2019f). Portaria 60, de 20 de março de 2019, dispõe sobre o mestrado e doutorado profissionais, no âmbito da CAPES. Recuperado de <http://capes.gov.br/images/novo_portal/portarias/22032019_Portarias_59e60.pdf>.
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior [CAPES] (2019g). Sobre o Processo de Avaliação. Recuperado de < http://capes.gov.br/avaliacao/sobre-a-avaliacao>.
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior [CAPES] (2020). Sobre o Processo de Avaliação. Recuperado de <https://www.capes.gov.br/avaliacao/entrada-no-snpg-propostas>.
Fundamentos em gestão de projetos: construindo competências para gerenciar projetos Creswell, J. W. (2010). Projeto de Pesquisa: métodos qualitativos, quantitativos e misto. 3. ed. Porto Alegre: Artmed.
Ferraz, R. R. N., Maccari, E. A., Quoniam, L., Silva, M. V. C., & Modkovski, A. F. (2017). Planejamento anual e quadrienal de prestação de contas à Capes por meio da ferramenta computacional Scriptsucupira. Revista Brasileira de Pós-Graduação, 14.
Ferreira, M. P. (2015). Pesquisa em administração e ciências sociais aplicadas. Grupo Gen-LTC.
Festinalli, R. C. (2005). A formação de mestres em administração: por onde caminhamos? Organizações & Sociedade, 12(35), 135-150.
Gibbs, G. (2009). Análise de dados qualitativos: coleção pesquisa qualitativa. Bookman Editora.
Goldman, S. L., Nagel, R. N., & Preiss, K. (1995). Agile competitors and virtual organizations: strategies for enriching the customer (Vol. 8). New York: Van Nostrand Reinhold.
Humble, Á. M. (2012). Qualitative data analysis software: A call for understanding, detail, intentionality, and thoughtfulness. Journal of family theory & review, 4(2), 122-137.
Kerzner, H. (2011). Gerenciamento de Projetos: uma abordagem sistêmica para planejamento, programação e controle. São Paulo: Blucher, 166.
Koskela, L., & Howell, G. (2002). The theory of project management: Explanation to novel methods. In Proceedings IGLC (Vol. 10, No. 1, pp. 1-11).
Koskela, L. J., Stratton, R., & Koskenvesa, A. (2010). Last planner and critical chain in construction management: comparative analysis. In Proceedings of the 18th Annual Conference of the International Group for Lean Construction (pp. 538-547). National Building Research Institute, Technion-Israel Institute of Technology.
Maccari, E. A., Almeida, M. I. R., Nishimura, A. T., & Rodrigues, L. C. (2009). A gestão dos programas de pós-graduação em administração com base no sistema de avaliação da CAPES. Revista de Gestão USP, 16(4), p. 1-16.
Maccari, E. A., Almeida, M. I. R., Riccio, E. L., & Alejandro, T. B. (2014). Proposta de um modelo de gestão de programas de pós-graduação na área de Administração a partir dos sistemas de avaliação do Brasil (CAPES) e dos Estados Unidos (AACSB). Revista de Administração, 49(2), 369-383.
Maccari, E. A., Martins, S. B., & Almeida, M. I. R. (2015). Comparativo entre os sistemas de avaliação da Association to Advance Collegiate Schools of Business (Estados Unidos) e da Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (Brasil) e o seu uso pelos coordenadores de programas. Revista Brasileira de Pós-graduação (RBPG), 12(27), p. 39-66.
Maccari, E. A., & Nishimura, A. T. (2014). Povoamento dos estratos conceitos 6 e 7 no sistema de avaliação da CAPES pela área de Administração, Ciências Contábeis e Turismo nas avaliações trienais 2010 e 2013. REAd-Revista Eletrônica de Administração, 20(3), 601-624.
Maccari, E. A., Rodrigues, L. C., Alessio, E. M., & Quoniam, L. M. (2008). Sistema de avaliação da pós-graduação da Capes: pesquisa-ação em um programa de pós-graduação em Administração. Revista Brasileira de Pós-Graduação, 5(9).
Marjaei, S., Yazdi, F. A., & Chandrashekara, M. (2019). MAXQDA and its Application to LIS Research. Library Philosophy and Practice, 1-9.
Martins, S. B., Maccari, E. A. & Martins, C. B. (2017). O uso dos métodos Delphi e AHP na priorização de projetos em programas de metrado profissional: Na área de administração pública e de empresas, ciências contábeis e turismo. Departamento de Ciências da Administração/UFSC.
Nunes, R. D. (2017). A Implantação das metodologias ágeis de desenvolvimento de software scrum e extreme programming (XP): uma alternativa para pequenas empresas do setor de tecnologia da informação. ForScience, 4(2).
Padalkar, M., & Gopinath, S. (2016). Are complexity and uncertainty distinct concepts in project management? A taxonomical examination from literature. International Journal of Project Management, 34(4), 688-700.
Poppendieck, M., & Poppendieck, T. (2003). Lean Software Development: An Agile Toolkit: An Agile Toolkit. Addison-Wesley.
Project Management Institute [PMI] (2017). A Guide to the Project Management Body of Knowledge [PMBoK® Guide], 6th ed. Newtown Square, USA: Author, p. 762.
Rabechini Jr., R., Carvalho, M. M., Rodrigues, I., & Sbragia, R. (2011). A organização da atividade de gerenciamento de projetos: os nexos com competências e estrutura. Gestão & Produção, 18(2), 409-424.
Rodríguez, P., Mäntylä, M., Oivo, M., Lwakatare, L. E., Seppänen, P., & Kuvaja, P. (2019). Advances in using agile and lean processes for software development. In Advances in Computers (Vol. 113, pp. 135-224). Elsevier.
Sabbagh, R. (2014). Scrum: Gestão ágil para projetos de sucesso. Editora Casa do Código.
Schwaber, K. (1995). Scrum Development Process. OOPLSA’95 Workshop on Business. Object Design and Implementation. Austin, 1995.
Shenhar, A. J., & Dvir, D. (2010). Reinventando gerenciamento de projetos: a abordagem diamante ao crescimento e inovação bem-sucedidos. São Paulo: M. Books.
Seppänen, O., Ballard, G., & Pesonen, S. (2010). The Combination of Last Planner System and Location-Based Management System. Lean construction journal.
Starkweather, J. A., & Stevenson, D. H. (2011). PMP® certification as a core competency: Necessary but not sufficient. Project Management Journal, 42(1), 31-41.
Stopa, G. R., & Rachid, C. L. (2019). Scrum: Metodologia ágil como ferramenta de gerenciamento de projetos. CES Revista, 33(1), 302-323.
Takahashi, A. R. W., Vercha, J. K., Montenegro, L. M., & Rese, N. (2010). Mestrado Profissional e Mestrado Acadêmico em Administração: Convergências, Divergências e Desafios aos Programas de Pós-Graduação Stricto Sensu no Brasil. Administração: ensino e pesquisa, 11(4), 551-578.
Teles, V. M. (2014). Extreme Programming-2ª Edição: Aprenda como encantar seus usuários desenvolvendo software com agilidade e alta qualidade. Novatec Editora.
Wirkus, M. (2016). Adaptive management approach to an infrastructure project. Procedia-Social and Behavioral Sciences, 226, 414-422.
Yin, R. K. (2015). Case study research: design and methods, 5th ed. Thousand Oaks, USA: SAGE Publications, inc.
Downloads
Veröffentlicht
Zitationsvorschlag
Ausgabe
Rubrik
Lizenz
Copyright (c) 2021 Revista de Administração da UFSM
Dieses Werk steht unter der Lizenz Creative Commons Namensnennung 4.0 International.
Authors of articles published by ReA/UFSM retain the copyright of their works, licensing them under the Creative Commons (CC-BY 4.0), which allows articles to be reused and distributed without restriction, provided that the original work is properly cited.