1.
Muller FM, Araujo OB, Stefanello F, Zanetti M. MIP–based heuristic for the unrelated parallel machine scheduling problem with sequence and machine-dependent setup times. ReA UFSM [Internet]. 2014 Sep. 20 [cited 2025 Jan. 12];7(3):506-23. Available from: https://periodicos.ufsm.br/reaufsm/article/view/13305