Muller, F. M., O. B. Araujo, F. Stefanello, und M. Zanetti. „MIP–based Heuristic for the Unrelated Parallel Machine Scheduling Problem With Sequence and Machine-Dependent Setup Times“. Revista De Administração Da UFSM, Bd. 7, Nr. 3, September 2014, S. 506-23, doi:10.5902/1983465913305.