[1]
F. M. Muller, O. B. Araujo, F. Stefanello, and M. Zanetti, “MIP–based heuristic for the unrelated parallel machine scheduling problem with sequence and machine-dependent setup times”, ReA UFSM, vol. 7, no. 3, pp. 506–523, Sep. 2014.