Muller, F. M., Araujo, O. B., Stefanello, F. and Zanetti, M. (2014) “MIP–based heuristic for the unrelated parallel machine scheduling problem with sequence and machine-dependent setup times”, Revista de Administração da UFSM, 7(3), pp. 506–523. doi: 10.5902/1983465913305.