Muller, F. M., Araujo, O. B., Stefanello, F. y Zanetti, M. (2014) «MIP–based heuristic for the unrelated parallel machine scheduling problem with sequence and machine-dependent setup times», Revista de Administração da UFSM, 7(3), pp. 506–523. doi: 10.5902/1983465913305.