Muller, F. M., Araujo, O. B., Stefanello, F., & Zanetti, M. (2014). MIP–based heuristic for the unrelated parallel machine scheduling problem with sequence and machine-dependent setup times. Revista De Administração Da UFSM, 7(3), 506–523. https://doi.org/10.5902/1983465913305