(1)
Muller, F. M.; Araujo, O. B.; Stefanello, F.; Zanetti, M. MIP–based Heuristic for the Unrelated Parallel Machine Scheduling Problem With Sequence and Machine-Dependent Setup Times. ReA UFSM 2014, 7, 506-523.