[1]
Muller, F.M., Araujo, O.B., Stefanello, F. and Zanetti, M. 2014. MIP–based heuristic for the unrelated parallel machine scheduling problem with sequence and machine-dependent setup times. Revista de Administração da UFSM. 7, 3 (Sep. 2014), 506–523. DOI:https://doi.org/10.5902/1983465913305.